East Petersburg Tank
Navarro & Wright provided contract documents for bidding and construction phase services for the rehabilitation, cellular antenna installations on the 0.1 MG elevated water storage tank.
Harrisburg Water Tanks
Navarro & Wright conducted a topographic survey of an area containing approximately 14-acres which included a lined, earthen reservoir approx. 20-feet deep with 1:1 embankments. The work entailed locating all piping including influent and effluent lines, valve vaults and other utilities.
Mount Joy Storage Tank
Charles E. Wright served as Lead Designer for the sizing, site layout, permitting and construction of the 0.25 MG elevated water storage tank for the Northside Water System.
Steelton Water Filtration Plant
Navarro & Wright provided professional services to Steelton Borough Authority for the preliminary design of improvements to the Authority’s water treatment plant (WTP). This work was undertaken in response to the need to construct improvements to the 30 year old facility.
Steelton Water Main
Navarro & Wright Consulting Engineers, Inc. planned, surveyed and designed approximately 5000 lineal feet of water main replacement and extension projects on streets within the Borough limits.
Steelton Water Tank Rehabilitation
Navarro & Wright Consulting Engineers, Inc. provided design bidding documents and construction phase services for the rehabilitation of the two 2 MG ground storage tanks.
Wormleysburg Borough Force Main
Navarro & Wright Consulting Engineers, Inc. designed the replacement of an 8-inch force main for the borough of Wormleysburg.