Dauphin County Recycling Center, Pennsylvania
Navarro & Wright designed a materials recycling facility for the Dauphin County Solid Waste Management and Recycling Agency.
Delaware River/Canal Project
Navarro & Wright provided surveying services to the Department of Conservation and Natural Resources for the Delaware River Canal Project.
East Petersburg Tank
Navarro & Wright provided contract documents for bidding and construction phase services for the rehabilitation, cellular antenna installations on the 0.1 MG elevated water storage tank.
Navarro & Wright prepared subdivision and land development plans for a 5.84-acre property in Springettsburry, York County, PA.
Eisenhower Business Center
Navarro & Wright provided site design services for the construction of two flex warehouse buildings located on the 8.17-acre site located in Swatara and Lower Swatara Townships in Dauphin County, Pennsylvania.
EZ Pass
Navarro & Wright Consulting Engineers, Inc. provided surveying services for the E-Z Pass Widening for the I-95 Perryville Interchange as part of the T.C. Simons, Inc. team for the Maryland Department of Transportation in Cecil County.
Fishing Creek
Navarro & Wright Consulting Engineers, Inc. provided all of the surveying services, utility coordination and hydrology and hydraulic design analysis for this project.
Guthrie Healthcare
Navarro & Wright Consulting Engineers, Inc. northern office staff in Towanda, PA provided professional services for Guthrie Healthcare's new surgery building that is part of a $36 million construction and renovation project located in Sayre, PA.
The $222 million cost estimate includes the demolition of old World War II era buildings, construction of the new terminal building, reconstruction of the aircraft and loading gate ramp area, an expanded terminal loop road, the multi-modal transportation complex, the new AMTRAK station, and a 10,000 foot parallel taxiway and CAT III ILS landing system.
Harrisburg Water Tanks
Navarro & Wright conducted a topographic survey of an area containing approximately 14-acres which included a lined, earthen reservoir approx. 20-feet deep with 1:1 embankments. The work entailed locating all piping including influent and effluent lines, valve vaults and other utilities.