Hauto Bypass, SR 0054, Carbon Co.
The project involves the relocation of approximately two miles of roadway. Navarro & Wright Consulting Engineers, Inc. conducted the geotechnical subsurface investigations, wetland identification & delineation, hazardous & residual waste assessment, groundwater studies, research and reconnaissance, drilling contract administration and drilling inspection.
I-476 Turnpike Bridge, Lehigh Co.
This project involves the replacement of two mainline bridges: NB525 (11 spans), which carries the Northeast Extension of the Turnpike (I-476) over the Lehigh River, the Norfolk Southern Railroad, PA Route 248, the abandoned Lehigh Railroad bed, and a canal; and NB-526 (6 spans), which carries the Northeast Extension of the Turnpike (I-476) over the Pohopoco Creek.
Kelker Park
Navarro & Wright Consulting Engineers, Inc. served as prime engineer for development of the Master Site Plan for Kelker Park.
Little Chiques Creek
Navarro & Wright Consulting Engineers, Inc. provided professional services to Manheim Area Economic Development Corporation that were associated with the preparation of a Hydraulic Analysis for a portion of Little Chiques Creek located between the Reading Railroad Bridge and the East Steigel Street Bridge.
Lower Rupley Park
Navarro & Wright Consulting Engineers, Inc. prepared a master concept plan and report with construction costs and recommendations for construction of a park area on approximately six acres along the Conodoguinet Creek.
Mount Joy Storage Tank
Charles E. Wright served as Lead Designer for the sizing, site layout, permitting and construction of the 0.25 MG elevated water storage tank for the Northside Water System.
New Cumberland Streetscape
Navarro & Wright Consulting Engineers, Inc., surveyed, mapped and designed approximately 4000 lineal feet of existing State and Borough roadways for a beautification project in New Cumberland Borough, New Cumberland, Pennsylvania.
New Oxford Manor Wastewater Treatment Plant
Navarro & Wright performed a full range of engineering services for a retrofit and expansion of an existing wastewater treatment plant and gravity collection system which services 100 mobile home units and provided capacity for commercial lots to be developed.
Newberry Township Wastewater Treatment Facility
Navarro & Wright provided professional engineering and surveying services to the Newberry Township Municipal Authority for the design of portions of a sanitary sewer interceptor and design of a new influent pumping station at the WWTP.
Newberry Township Wastewater Treatment Facility Influent Pumping Station
Navarro & Wright provided professional engineering services to the Newberry Township Municipal Authority (NTMA) for the design of a new influent pumping station at the wastewater treatment plant.