Bridge over Antietam Creek


Bridge over Antietam Creek

Bridge over Antietam Creek

This project involved the replacement of the bridge over Antietam Creek. N&W participated in the preliminary engineering and final design phases of this project.  Preliminary design services included a Phase I ESA, surveys, ROW, utilities, and geotechnical services including the preliminary GER, drilling contract administration, drilling inspection, and laboratory testing.  The firm also participated in the final design phase which consisted of the Final Structure Foundation Report, Phase III Environmental Site Assessment, and hazardous and residual wastes.

Project Achievements:

  • Showcased site characterization abilities
  • Identified petroleum contaminated plume trending toward bridge
  • Performed extra work within original budget, resulting in time and costs
    savings during construction